  • ‘MunmuBaram’ JV aims to develop, construct, and operate Up to 1.2GW floating offshore wind farm,
       located offshore South-East Korea, between 65 and 80 km from the city of Ulsan, South Korea
  • MunmuBaram project is a significant development towards South Korea’s ‘Renewable Energy 3020 Plan’,
       which aims to increase domestic renewable energy generation to 20% of the energy mix by the year 2030
       and will assist in meeting its ambition to become carbon neutral by 2050
  • ‘문무바람’은 부유식 해상풍력발전으로 늘어나는 에너지 수요를 충족하고 2050 탄소중립 목표 달성에 기여하고자 합니다.
  • MunmuBaram Floating Offshore Project
  • · Location : 65 km away from Ulsan City, Korea
  • · Project Area : ~ 240 ㎢
  • · Water Depth : 120 ~ 150m
  • · High Load Factor : ~ 40%
  • · Total Capacity : 1.2GW
풍력발전기 작동원리 / 루트 이미지 풍력발전기 작동원리 / 루트 이미지
  • Onshore Works
  • · Check existing infrastructure with local communities' acceptance
  • · Grid Connection Agreement with KEPCO
  • · Landfall and onshore substation
  • · Onshore Transmission Line
  • · 계통 설비 건설
  • Offshore Works
  • · Wind Turbine Generator
  • · Floater, Mooring, Inter array cable
  • · Offshore Substation (floating vs. Fixed)